CASE STUDY · WATER & WASTEWATER

Delivering a Skid-Mounted Pump Package for a Water Facility

A pre-assembled, tested pump skid reduced field construction time for a municipal upgrade.

Services: Engineering support · Fabrication · Testing

The Challenge

A water utility needed to upgrade a booster station within a short shutdown window. Building the system on site would have taken longer than the window allowed.

The Solution

RNOW coordinated the design and fabrication of a skid-mounted pump package with piping, valves and controls, factory-tested before shipment. The utility's crews focused on setting the skid and making the final connections.

The Results

  • Shorter field installation time
  • Testing completed before delivery
  • Fewer site issues thanks to factory quality control
  • Field installation time shortened by several days