CASE STUDY · WATER & WASTEWATER
Delivering a Skid-Mounted Pump Package for a Water Facility
A pre-assembled, tested pump skid reduced field construction time for a municipal upgrade.
Services: Engineering support · Fabrication · Testing
The Challenge
A water utility needed to upgrade a booster station within a short shutdown window. Building the system on site would have taken longer than the window allowed.
The Solution
RNOW coordinated the design and fabrication of a skid-mounted pump package with piping, valves and controls, factory-tested before shipment. The utility's crews focused on setting the skid and making the final connections.
The Results
- Shorter field installation time
- Testing completed before delivery
- Fewer site issues thanks to factory quality control
- Field installation time shortened by several days